Vessel-side coordination
Battery, power conversion, charging and control interfaces, coordinated with vessel designers and equipment suppliers. Translate operating requirements into an agreed integration scope.
04 / OUR INDUSTRIES
Coordinate electric vessel systems with the shore power, charging equipment and infrastructure at the berth.

An electric vessel and its berth form one operating system. We bring the vessel requirements, shoreside equipment and available electrical supply into the same plan, with the connection between them clearly defined.
Battery, power conversion, charging and control interfaces, coordinated with vessel designers and equipment suppliers. Translate operating requirements into an agreed integration scope.
Charging equipment, connectors, cable handling and shoreside electrical distribution. Review berth arrangements, connection procedures and the site supply.
Monitoring, communications, energy management and supporting equipment at the berth. Coordinate marine and land-based responsibilities, environmental conditions and applicable approvals.
FROM REQUIREMENTS TO DELIVERY
Review vessel energy needs, routes, berth time and the available charging window.
Define electrical, mechanical, communications and operating interfaces on both sides of the connection.
Develop the equipment scope and installation plan with vessel, port and utility stakeholders.